Evacuate a 38 mile long 30” OD pipeline at 520 psig to prepare for several anomaly dig driven pipe replacements
Case
Studies
Case
Studies
Discover what ReCo can do for you by looking through our history of case studies.

Evacuate a 38 mile long 30” OD pipeline at 520 psig to prepare for several anomaly dig driven pipe replacements
Two ReCo units moved over 32 MMSCF of natural gas from the line into an in-service line over four days
Result:
Client saved significant money and emissions reporting on this project by avoiding a blowdown or flaring, and maintained their project outage schedule