Natural gas pipeline and distribution operator “Pull” via temporary compression multiple smart pig runs by moving the gas in front of the pig
Case
Studies
Case
Studies
Discover what ReCo can do for you by looking through our history of case studies.

Natural gas pipeline and distribution operator “Pull” via temporary compression multiple smart pig runs by moving the gas in front of the pig
Six ReCo units were able to achieve the needed flowrates to move the smart pigs at an acceptable speed
Result:
Client was able to successfully complete their ILI project while avoiding large volumes of reportable methane emissions from flaring or venting.